TM 5-3895-385-23-3
0438
Table 1. Maintenance Allocation Chart (MAC) for the Bituminous Material Paving Machine (BMPM) --
Continued.
(1)
(2)
(3)
(4)
(5)
(6)
GROUP
COMPONENT/
MAINTENANCE
MAINTENANCE LEVEL
TOOLS AND
REMARKS
NUMBER
ASSEMBLY
FUNCTION
EQUIPMENT
CODE
FIELD
SUSTAINMENT
REFERENCE
CODE
CREW
MAINTAINER
BELOW
DEPOT
DEPOT
C
F
H
D
AAEAFN
Turbocharger
Remove/Install
15
1, 2
2
W
and
Turbocharger
AAEAFP
Plumbing
H
AAEAFO
Remove/Install
16
1, 2
Y
Manifold
AAEAFL
Battery
Remove/Install
33.6
1, 2
W
Charging-
Idler Pulley
Assembly, and
Belt Tensioner
AAEAFL
Battery-
Remove/Install
34.3
1, 2
W
Charging
Battery-
Charging
AAEAFN
Engine Electric
Remove/Install
11.7
1, 2
A
Starter
AAEAFQ
Flywheel
Remove/Install
83.4
1, 2, 8, 9, 10,
L
13, 14, 25
Crankshaft Rear
Remove/Install
85.4
1, 2, 8, 9, 10,
Oil Seal
13, 14, 25
60-Gallon Fuel
Remove/Install
16.1
1, 2, 25
AAEAG
Tank Assembly
AAEAG
Secondary Fuel
Remove/Install
11.6
1, 2
Tank
AAEAG
Fuel Tank
Remove/Install
10.5
1, 2
Sensor
AAEBH
Batteries and
Remove/Install
0.5
1, 2
Battery Tray
Disconnect
0.1
1, 2
Connect
0.1
1, 2
Cleaning
0.1
1, 2, 5
AAFBA
Power Wiring
Remove/Install
11.3
1, 2
Harness
0438-12