TM 5-3895-385-10
0006
EXTENDING SCREED EXTENSION -- CONTINUED.
Figure 10. Screed Control -- Screed Extension.
WARNING
Be sure area surrounding BMPM is clear of personnel and objects before moving the unit,
opening hopper wings, lowering screed, or deploying screed extensions. Sound unit horn before
moving unit from stopped position. Turn on beacon when unit is in motion. Failure to comply may
cause injury or death to personnel or damage to equipment.
1. Press and hold desired screed extension in key (Figure 10, Item 2) until desired extension (Figure 9, Item 1)
is achieved, and then release key.
2. Press and hold desired screed extension out key (Figure 10, Item 1) until desired extension (Figure 9, Item 2)
is achieved, and then release key.
END OF TASK